

Failure Mode 01: Pin Bore Ovalization
An undersized or improperly heat-treated bore deforms under oscillating load. Contact stress concentrates, wear accelerates, and the entire linkage misaligns - transferring additional bending moment into the arm body.
- Bores are machinedafterheat treatment, not before.
- Final geometry verified - not a pre-treatment dimension that shifts during cooling.
- Roundness and taper checked against your drawing datums.
Failure Mode 02: Hub-to-Arm Fatigue
The arm and hub operate at different thermal masses. Repeated heating and cooling generates alternating stress at the transition. Shrinkage porosity or an unfavourable as-cast microstructure in that zone gives a fatigue crack its initiation point.
- Critical section inspected with wall-thickness verification.
- Surface integrity checks (Visual + PT) at the highest stress zone.
- Solution annealing documented per heat number to stabilize the matrix.

The engineering decision that determines life.
The most expensive crank arm is not the one with the highest alloy content - it is the one that fails prematurely because the grade was selected for price rather than for the actual failure driver.
HH Grade
25Cr - 12Ni
Moderate temperature, higher thermal cycling frequency.
Furnace operates in the lower heating zone and cycle frequency dominates.
Baseline Cost
HK Grade
25Cr - 20Ni
Higher temperature with mixed oxidizing / sulphidizing atmosphere.
Crank arm sees sustained temperatures where HH would
scale or creep.
HN Grade
20Cr - 25Ni
Highest temperature, most severe thermal cycling.
Upper end of the walking beam window; outage cost justifies material premium.
Highest Cost
Every value tied to a heat number.
Production specifications, not catalogue ranges. All test reports and certificates ship with the casting.
| Material Standard | ASTM A297/A297M heat-resistant castings |
| Available Grades | HH (25Cr-12Ni) · HK (25Cr-20Ni) · HN (20Cr-25Ni) |
| Service Temperature | HH: up to 1050°C · HK: up to 1100°C · HN: up to 1150°C |
| Melting | Electric-induction furnace |
| Casting Process | Sand casting / Investment casting |
| Heat Treatment | Solution annealing, documented time-temperature cycle per heat number |
| Bore Finishing | Machined after heat treatment to final tolerance |
| Critical Inspection | Hub-to-arm transition: wall-thickness + surface integrity (PT) |
| Hardness Report | Reported per heat number against grade specification |
| Chemical Composition | C, Mn, Si, P, S, Cr, Ni, Mo reported against ASTM A297 |
| Documentation | MTC, heat treatment chart, dimensional report, NDT (PT/UT) |
Send your drawing. Get a spec-matched quote in 48 hours.
The more linkage and operating data you provide, the tighter the quote.
Crank arm drawing (PDF / DWG / STEP)
If no drawing: pin bore distance, arm angle, hub bore
Operating temperature (continuous and peak)
Walking beam mechanism type and cycle frequency
Material grade preference or operating envelope

Contact us
Hot Tags: heat resistant cast steel crank arm for walking beam furnace, China heat resistant cast steel crank arm for walking beam furnace manufacturers, suppliers, factory, boiler parts, boiler sections, heat resistant steel casting parts, Integrally Cast Annealing Process Furnace Frame, parts in a boiler, parts of a boiler

